In 2025, LINX supplied, installed and commissioned hybrid solar and battery systems at four Federal Inland Revenue Service offices in Lagos, Kaduna and Benue.

4

Sites commissioned

120,650 W

Solar PV installed

120 kWh

Lithium-ion storage

4–6 wks

Delivery per site

The four systems

Designed site by site.

Different load, different roof, different system — the same commissioning standard.

Site
System
Where
FIRS LTO, Agidingbi
33 kVA hybrid; 120 kWh lithium-ion; 120,650 W monocrystalline solar
Lagos
FIRS Kaduna GBO & MTO
66 kVA, 48 V hybrid transformer-based inverter and solar panels
Kaduna
FIRS Ikeja 2 MTO/ETO
88 kVA, 48 V hybrid transformer-based inverter
Lagos
FIRS Makurdi ETO
66 kVA, 48 V hybrid transformer-based inverter
Benue
LINX engineers commissioning hybrid inverters

What we delivered

Assess. Design.
Install. Commission.

An electrical assessment of the existing environment, a system design, the equipment, the installation, commissioning and post-handover support.

Solar PV system design and installationHybrid inverter and battery storage systemsElectrical distribution and infrastructurePower assessment and system integrationCommissioning, maintenance and technical supportRenewable-energy consultancy
Solar panels being installed on an office roof in Lagos
The LINX engineering team on site

FIRS solar installation and commissioning · Lagos, 2025

Move a site onto hybrid power.

Send the load profile and the site photographs. We will return an assessment and a system design.

Start a projectSee LINX Energy

info@linx.ng · 0803 310 7402